Skip to main content

City dam removal delayed a year for observation

By
Lori Ehde

Removal of the low-head dam on the Rock River near Luverne City Park will be delayed until next year in order to study its effect on city wells.The dam will be replaced by a system of nine rock weirs that will be installed starting north of the Main Street bridge and continue past the railroad bridge.The weirs will control the grade of the river, so the water level doesn't drop and affect the city's wells. If the river level drops more than a few feet, it would affect the adjacent shallow aquifer that feeds the city's water supply.Two surveying sources have confirmed the project won't affect the river level by more than 12 inches, but the city and county want to err on the side of caution.To measure the project's effect on water levels, the stop logs will be removed on each side of the dam to more slowly release water.According to Rock County Land Management Assistant Director Doug Bos, two feet of wood plank will be removed at a time with well observation in between. "This way we can make sure we don't adversely affect the aquifer that feeds city wells," Bos said Friday. "The U.S. Geological Service has an extensive ground model that says it won't affect the wells, but this is a double check."To read the rest of this article, and the entire edition of the Star Herald, click on the ONLINE EDITION button on the top of this page on the right hand side.

You must log in to continue reading. Log in or subscribe today.