H-BC School Board meets Jan. 29

H-BC School Board

meets Jan. 29

Hills-Beaver Creek Dist. 671

Minutes

January 29, 2024

SPECIAL MEEETING

The Hills-Beaver Creek School Board met for a Special meeting at 6:30 p.m. at the H-BC School District Board room, 301 N Summit Ave, Hills, MN.

Board members and Administration present were Bosch, Gehrke, Harnack, Helgeson, Rauk, Rozeboom and Uittenbogaard. Superintendent Holthaus and Business Manager Rozeboom were also in attendance. Principal Kellenberger was

absent.

Motion by Harnack, second by Uittenbogaard, and carried to approve the agenda.

Visitor to the meeting was Mavis Fodness - Rock County Star Herald.

Motion by Harnack, second by Rauk, and carried to approve acceptance of the following Bids related to the District’s new Elementary School and Bond Construction Projects, as recommended by RA Morton Construction Management:

•Approve Bid 3A: Concrete- $1,530,682- Musch Construction, Inc.

•Approve Bid 3B: Precast Concrete- $2,879,447- Collins Precast, LLC

•Approve Bid 5A: Steel Supply- $524,000- DAKA Corporation

•Approve Bid 5B: Steel Erection- $299,742- BluArc Steel & Precast, Inc.

•Approve Bid 8A: Doors, Frames & Hardware- $186,230- Builders Supply Company

•Approve Bid 8B: Aluminum Doors & Windows- $675,100- G&D Viking Glass,

Inc.

•Approve Bid 22A: Plumbing & HVAC- $6,137,700- Krier & Blain, Inc.

•Approve Bid 26A: Electrical- $2,075,400- Electric Construction Company

•Approve Bid 31A: Excavation- $2,858,893- Duininck, Inc.

•Approve Bid 6A: Carpentry- $506,000- Visions Construction Group, Inc.

•Approve Bid 7B: Joint Sealants- $68,250- Superior Caulking, Inc.

•Approve Bid 8C: Overhead Doors- $47,150- Overhead Door Company of

Sioux Falls, Inc.

•Approve Bid 9A: Gypsum System- $724,000- Pietsch Construction, Inc.

•Approve Bid 9B: Tilework- $299,945- Grazzini Brothers & Company

•Approve Bid 9C: Acoustical Ceilings- $328,750- B & G Acoustical, Inc.

•Approve Bid 9D: Wood Flooring- $124,700- FLR Sanders, Inc.

•Approve Bid 9E: Floor Covering- $272,900- Arnquist Home Center, Inc. dba

Arnquist Carpets Plus Color Tile

•Approve Bid 9G: Painting- $312,000 -Steinbrecher Painting Company

•Approve Bid 10B: Lockers- $88,954- Olympus Lockers & Storage Products,

Inc.

•Approve Bid 10: Operable Partitions- $137,875- W. L. Hall Company

•Approve Bid 11A: Food Service- $265,175- Horizon Equipment, LLC

•Approve Bid 11B: Gymnasium Equipment- $84,140- H2I Group, Inc.

•Approve Bid 12A: Bleachers- $50,890- H2I Group, Inc.

•Approve Bid 21A: Fire Suppression- $187,425- The Fire Group, Inc.

•Approve Bid 32A: Bituminous Paving- $551,479- Double H Paving, Inc.

Motion by Helgeson, second by Bosch, and carried to approve acceptance of the following Alternate Bids related to the District’s new Elementary School and Bond Construction Projects, as recommended by RA Morton Construction Management:

•Approve Alternate 17 - Deduction of $50,292- Polypropylene Domestic

Water Piping in Lieu of Copper Piping: State on Bid Form the amount to be

added to or deducted from Base Bid to provide Polypropylene piping for do

mestic water piping systems in lieu of soldered copper. Include added pipe

hangers required for plastic piping. Polypropylene pipe couplings and fittings may

be used on domestic water cold, hot and recirculation water piping up to 230

degrees F.

•Approve Alternate 18 - Deduction of $77,363- Polypropylene Hydronic Piping

in Lieu of Steel/Copper Piping: State on Bid Form the amount to be added to

or deducted from Base Bid to provide Polypropylene piping for hydronic piping

systems in lieu of welded steel and soldered copper. Include added pipe hangers

required for plastic piping. Polypropylene pipe couplings and fittings may be used

on heating water, chilled water and tertiary water supply and return piping up

to 230 degrees F.

•Approve Alternate 19 - Deduction of $105,192- Alternate Face Brick (FB1)

Selection: State on Bid Form the amount to be added to or deducted

from the Base Bid to provide Alternate Face Brick 1 in lieu of Base Bid Face

Brick 1 (FB1) where it occurs at precast walls and masonry cavity walls. Refer

to Sections 03 45 16 and 04 20 00 for product information.

•Approve Alternate 20 - Deduction of $105,192- Alternate Face Brick (FB2)

Selection: State on Bid Form the amount to be added to or deducted

from the Base Bid to provide Alternate Face Brick 2 in lieu of Base Bid Face

Brick 2 (FB2) where it occurs at precast walls. Refer to Section 03 45 16

for product information. Alternate 20 added in Addendum No. 2

•Approve Alternate 21 - Deduction of $7,905- Delete Southwest Retaining

Wall and Guardrail: State on Bid Form the amount to be deducted from

the Base Bid to delete southwest retaining wall and guardrail as indicated on

site and Civil Drawings. Contractor shall hold alternate pricing until

determination by Rock County, Minnesota of wetland encroachment.

Motion by Uittenbogaard, second by Rozeboom, and carried to approve holding over the following Bids related to the District’s new Elementary School and Bond Construction Projects, Until further details/options are explored, further action at later

time, as recommended by RA Morton Construction Management:

•Approve holding over Bid 32C: Fences & Gates- $108,427- TLMV,

Ic.-dba American Fence Company of South Dakota

•Approve holding over 6B until further details are explored- Architectural

Woodwork $477,000 Southern Minnesota Woodcraft, Inc.

•Approve holding over 6C until further details are explored- Glue Laminated

Structure $715,000 Visions Construction Group, Inc.

•Approve holding over Alternate 1 until further details are explored - Existing

West Parking Lot Renovation at Secondary School: State on Bid Form, amount

to be added to Base Bid to provide renovations to existing west parking lot at

Secondary School, noted on Landscape and Civil Drawings.

Refer to associated Specifications, References, and Details. ($74,221)

•Approve holding over Alternate 2 until further details are explored - South

Parking Lot Addition at Secondary School: State on Bid Form, amount to be

added to Base Bid to provide an addition to the south parking lot at

the Secondary School, noted on Landscape and Civil Drawings. Refer to

associated Specifications, References, and Details. ($82,525)

•Approve holding over Alternate 3A until further details are explored - Track

& Field Event Area at Secondary School - Asphalt: State on Bid Form,

amount to be added to Base Bid to provide track and field event area at

the Secondary School, noted on Landscape and Civil Drawings. Refer

to associated Specifications, References, and Details. ($253,765)

Approve holding over Alternate 3B until further details are explored - Track

& Field Event Area at Secondary School - Concrete: State on Bid Form,

amount to be added to Base Bid to provide track and field event area

at the Secondary School, noted on Landscape and Civil Drawings. Refer

to associated Specifications, References, and Details. ($100,059)

Motion by Harnack, second by Rauk, and carried to reject the following Bids or Alternate Bids related to the District’s new Elementary School and Bond Construction Projects, as recommended by RA Morton Construction Management:

•Reject Alternate 4 - Folding/Sliding Glass Partition at Classrooms, Media

Center, and Maker Space: State on Bid Form, amount to be added to or

deducted from Base Bid to provide (6) sliding glass partitions at Classrooms

(B118, B120, B121, B123), Media Center (B108), and Maker Space (B105),

in lieu of window frame H113 at classrooms, window frame H11 at Media

Center, and Door/frame B105A at Maker Space. Alternate includes associated

structural changes and recessed floor track. Refer to Specification Section

08 32 14. ($180,282)

•Reject Alternate 5 - Exterior Illuminated Logo: State on Bid Form, amount to be

added to Base Bid to provide large format dimensional, LED lighted

signage. Electrical rough-in power to be provided by base bid. Refer to

Specification Section 10 14 00. No Bid received.

Reject Alternate 6 - Wall Tile: State on Bid Form, amount to be added Base

Bid to provide Wall Tile where noted. Refer to Architectural Floor Plans, Finish

Plans, and Interior Elevations. Refer to associated Details, References, and

Specification Section 09 30 00. ($69,950)

•Reject Alternate 7 - Countertop at Displacement in Classrooms, Quartz: State

on Bid Form, amount to be added to Base Bid to provide quartz counters

noted in classrooms on mechanical displacement units. Refer to Architectural

Floor Plans, and Refer to Specification Section 06 61 19. ($47,700)

Reject Alternate 8 - Countertop at Displacement in Classrooms, PLAM:

State on Bid Form, amount to be added to Base Bid to provide Plastic

Laminate counters noted in classrooms on mechanical displacement units.

Refer to Architectural Floor Plans, and Refer to Specification Section 12 32 16.

($9,800)

Reject Alternate 9 - Countertops Quartz in Lieu of PLAM, All Counters: State

on Bid Form, amount to be added to or deducted from Base Bid to provide

quartz countertops in lieu of plastic laminate countertops, excluding built-in

desks, which shall remain PLAM. Refer to Specification Sections 06 61 19

and 12 32 16. ($82,500)

•Reject Alternate 10 - Terrazzo in Lieu of Polished Concrete: State on Bid

Form, amount to be added Base Bid to provide Epoxy Terrazzo where noted.

Refer to Architectural Floor Plans and Finish Plans. Refer to associated Details,

References, and Specification Sections 09 66 23 and 03 35 36. ($62,770)

•Reject Alternate 11 - Face Brick 2 in lieu of Precast Finish at Gymnasium:

State on Bid Form the amount to be added to or deducted from the Base

Bid to provide Face Brick 2 (FB2) in lieu of Base Bid colored precast with

reveals and sandblast/acid-etch finish where indicated on drawings. Refer

to Exterior Elevations and Specification Section 03 45 16. ($80,580)

•Reject Alternate 12 - Intrusion Resistant Glass at Classrooms Entry Frames:

State on Bid Form, amount to be added to or deducted from Base Bid to provide

intrusion resistant glass (GL7) at windows and doors in lieu of glass types

indicated by base bid. Refer to Hollow Metal Frame and Door Elevations

and Specification Sections 08 11 13 and 08 81 10, including associated

references and Details. ($18,500)

•Reject Alternate 13 - Ceramic Wall Tile at Kitchen in Lieu of Epoxy Paint:

State on Bid Form, amount to be added Base Bid to provide Ceramic Wall

Tile in lieu of epoxy paint at Kitchen (Room D103). Refer to Architectural

Floor Plans, Finish Plans, and Interior Elevations. Refer to associated Details,

References, and Specification Section 09 30 00 ($21,400)

•Reject Alternate 14 - Exterior Walking Path: State on Bid Form, amount to be

added to Base Bid to provide exterior walking path noted on Landscape and

Civil Drawings. Refer to associated Specifications, References, and Details.

Alternate includes the necessary earthwork, compaction, aggregate base,

paving and erosion/sediment control. Alternate includes electrical lighting,

noted on Electrical Drawing E1.2 as “Bike Path”, including associated

Specifications, Details, and References. ($185,884)

•Reject Alternate 15 - Screen Wall at Rooftop Mechanical Equipment, Above

Mechanical Room D201: State on Bid Form, amount to be added to Base Bid

to provide screen wall at rooftop mechanical equipment, where indicated on

Drawings. Refer to Roof Plans, including associated Details, References,

1/A7.1 and Section 08 92 10. ($55,655)

•Reject Alternate 16 - Single Ply KEE Roofing with 30-year warranty in

Lieu of Single Ply TPA: State on Bid Form, amount to be added to or

deducted from Base Bid to provide single ply, fully adhered KEE Roofing

in lieu of single ply, fully adhered TPA roofing, with a 30 year warranty, in

lieu of 20 year warranty. Refer to Roof Plans, including associated Details,

References, and Specification Sections 07 54 19 and 07 54 16. ($320,106)

Motion by Harnack, second by Helgeson, and carried to approve

adjournment of meeting.

Time of Adjournment 6:44 p.m.